VIS Group is preparing to commission the third polyclinic of the PPP project in Novosibirsk
09.10.2024
The new clinic with a total area of over 11,000 m2 will serve almost 30,000 people.
VIS Group completes the monolithic frame of the first building of the Obdorsky residential complex in Salekhard
07.10.2024
The total volume of concrete laid in the building structure is almost 40,000 m3.
Construction of PPP Polyclinic №16 in Novosibirsk reaches the 3rd floor mark
04.10.2024
The new medical complex is designed for 1,194 visits per shift and will be able to serve 80,000 residents of the Leninsky District.
Monolithic work is completed at a polyclinic in Yakutsk
03.10.2024
VIS Group is building the largest medical center in the capital of Yakutia - a six-story polyclinic building of Hospital #2 in the Gagarinsky District.
VIS Group presents its own operator at the strategic session of toll road operators in Russia
02.10.2024
Transtoll is currently engaged in the commercial and technical operation of the Khabarovsk Bypass highway.
Arctic Center under construction revealed to participants of the urban tour in Yakutsk
01.10.2024
On October 1, an urban tour for professional architects of the Republic of Sakha (Yakutia) was held in Yakutsk.
Governor of Yamal Dmitry Artyukhov assesses the capabilities of the rehabilitation center built by VIS Group
30.09.2024
Doverie was commissioned at the end of August, and is now preparing to receive children.
VIS Group successfully completes strength tests of the bridge across the Ob River in Novosibirsk
30.09.2024
Preliminary test results confirmed that all of the bridge’s technical parameters comply with the standard and design requirements.