VIS Group presents its own operator at the strategic session of toll road operators in Russia
02.10.2024
Transtoll is currently engaged in the commercial and technical operation of the Khabarovsk Bypass highway.
Arctic Center under construction revealed to participants of the urban tour in Yakutsk
01.10.2024
On October 1, an urban tour for professional architects of the Republic of Sakha (Yakutia) was held in Yakutsk.
Governor of Yamal Dmitry Artyukhov assesses the capabilities of the rehabilitation center built by VIS Group
30.09.2024
Doverie was commissioned at the end of August, and is now preparing to receive children.
VIS Group successfully completes strength tests of the bridge across the Ob River in Novosibirsk
30.09.2024
Preliminary test results confirmed that all of the bridge’s technical parameters comply with the standard and design requirements.
VIS Group begins installing a "glass lake" on the roof of the Arctic Center in Yakutsk
28.09.2024
The roof of the future center will be usable, with a total area of over 9,700 m2.
VIS Group places three-year bonds in the amount of RUB 2.5 billion
25.09.2024
The Expert RA rating agency assigned the securities a ruA+ credit rating.
ROSDORNII experts visit the Lena Bridge construction site
25.09.2024
They visited technological site No. 1, where they familiarized themselves with the project’s key parameters and the progress of construction work.
Project of the bridge across the Kaliningrad Bay receives a positive conclusion from the Main Directorate of State Expertise of Russia
25.09.2024
The concessionaire is VIS Group, the concession grantor is the government of Kaliningrad Region.