“The construction is colossal” – Head of Yakutia on the construction of a cultural cluster in the republican capital
19.08.2024
VIS Group, which is implementing this project on the principles of public-private partnership, is increasing the pace and volume of work in order to make the most of the short construction season.
VIS Group begins delivering concrete plants for the construction of the Lena Bridge
13.08.2024
One of the Euro trucks with a lifting capacity of about 20 tons has already left for Yakutsk; a total of 8 heavy-duty trucks with equipment will be dispatched.
Design of a museum complex in Chita to  be built in a concession format begins
09.08.2024
The 10,000+ sq. m museum center on the bank of the Chita River will integrate exhibition, congress and leisure and entertainment spaces under one roof.
VIS Group to install two concrete plants for construction of Lena Bridge
07.08.2024
VIS Group is the project’s concessionaire, investor and general contractor.
VIS Group begins landscaping of the premises of the new administrative complex in the capital of Yamal
05.08.2024
Inside the already constructed buildings, the installation of engineering systems, the construction of partitions and the rough finishing of the premises continue.
Head of Yakutia monitors the construction of one of the largest medical centers in the republic, built by VIS Group
03.08.2024
As of today, the construction readiness of the outpatient clinic is 25%.
Expert RA confirms VIS Group’s credit rating at ruA+
31.07.2024
The rating outlook is stable.
Perinatal center in Surgut sets records
30.07.2024
The district clinical center, designed for 10,000 births per year currently has 70 departments. They provide high-tech medical care not only to newborns, but also to expectant parents.