The VIS Group
26.03.2021
The analytical agency ACRA has assigned an A(RU) rating to the issue.
 The structure of the bridge over the Lena River in Yakutia passes the first field tests
23.03.2021
The test did not reveal any shortcomings in the bridge design, and the next stage of testing is being prepared.
VIS Group has successfully closed the order book for the exchange-traded bond issue with an oversubscription of 60%
23.03.2021
The order book was closed with a high demand of over 3.1 billion rubles.
The coupon rate of the VIS Group exchange-traded bonds has been adjusted from 9.25% to 9-9.15%
23.03.2021
The new range is authorized due to high demand for the holding's securities.
 Acting Head of the Federal Road Agency Roman Novikov assessed the readiness of the Khabarovsk Bypass highway
22.03.2021
Commissioning of the highway is scheduled for fall 2021.
The rate indicator of the second issue of bonds of the VIS Group has been increased to 9.25%
19.03.2021
The opening of the book for bid collection for the VIS Group's second bond issue is scheduled for March 23.
Surgut District Clinical Center is equipped with a telemedicine hall
10.03.2021
The use of this technology will significantly expand the possibilities of care provision by highly qualified specialists without a full-time visit to the perinatal center.
VIS FINANCE to collect applications for bonds in the amount of RUB 2 billion on March 23
09.03.2021
The preliminary technical bond placement date is March 26.