Financial closure of the concession project for the creation of a bridge over the river Ob in Novosibirsk
27.03.2020
A loan agreement on financing capital expenditures is totaling 6.5 billion rubles, and the total limit of borrowed funds attracted for the implementation of the project exceeds 9 billion rubles.
#VIS-20years. Igor Snegurov, Chairman of the Board of Directors: “International experience demonstrates that it is the development of infrastructure that allows us to overcome any crises, create a margin of safety and development potential.”
27.03.2020
On the 20th anniversary of VIS Group, a series of interviews with the leaders of the holding and the companies included in it are published on the website.
VIS Group celebrates 20-year anniversary
27.03.2020
Over the course of this time, the company has gone from a construction contractor to one of the largest infrastructure holdings in Russia that comprises over a dozen companies.
VIS Group is completing survey work on the construction site for the bridge over the Kaliningrad Bay
25.03.2020
Drilling operations are underway at the future bridge crossing construction site in Kaliningrad, wit 270 wells already drilled.
7 drilling units are engaged in the survey works on the Lensky Bridge site in Yakutsk
18.03.2020
Data from experts is coming in real time. Drilling machines are drilling wells up to 55 meters deep at specially prepared sites and take soil samples at the proposed locations of the main bridge supports.
VIS Group completes main survey works in the framework of designing a unique cultural cluster in Yakutsk
12.03.2020
By the end of June 2020, project documentation for State Philharmonic and the Arctic Center for Epic Literature and Arts in Yakutsk is slated to be submitted to State Expertise.
Ministry of Economic Development of the Russian Federation rates VIS Group’s concession projects as the largest in Russia
26.02.2020
Three of VIS Group‘s projects – Khabarovsk Bypass highway, bridge across the Kaliningrad Bay and bridge across the Lena River in Yakutia were included in the rating of the department’s informational and analytical review. The last two are implemented on the basis of the holding’s private concession initiative.
A Consortium of Rostech and VIS Group begins surveying work in Yakutia as part of the construction project for a bridge over the river Lena
17.02.2020
Four drilling rigs were relocated to the future construction site to start prospecting work “from the ice.” All the survey and design stage work is funded by the concessionaire.