Optional wells of Phase IV at the Orenburg gas condensate field, Orenburg Region
Optional wells of Phase IV at the Orenburg gas condensate field, Orenburg Region
Client: "Gazprom dobycha Orenburg", LLC
General contractor: VIS Group
The project's objective was to boost gas and condensate production, connection of 80 wells to a unified system of gas supply to the Orenburg Gas Processing Plant.
The works included: piping and construction of 80 wells, construction of prefabricated pipe manifolds, construction of gas and methanol pipelines between wells, LPG with connecting them to the GPP, cathodic protection, instrumentation, telemechanics, (excavation, welding and assembly, construction, insulation-laying work).
Laying 140 km of pipelines was performed with the use of horizontal directional drilling.