Gas turbine power plant with capacity of 120 MW for the needs of Novy Urengoy gas and chemical complex

Gas turbine power plant with capacity of 120 MW for the needs of Novy Urengoy gas and chemical complex


Investor: Gazprom

Client: "NUGCC", LLC

General contractor: VIS Group

Novy Urengoy gas and chemical complex is a complex with the production process cycle, requiring a continuous supply from thermal sources and utilities. Therefore, the production infrastructure fully supports the needs of the complex for electricity, heat and water.

The required amount of electricity will be generated by the gas turbine power plant (GTPP) with capacity of 120 MW, located directly at the production site. Its primary fuel shall be the methane fraction from ethylene production and natural gas as the backup fuel.

The project is unique in many respects as it is realized on lands with permafrost, under the climatic conditions of extreme cold and serious water scarcity. VIS Group experts during the construction of this facility use cutting-edge technologies, special attention is paid to the quality of work.



Back