VIS Group creates emergency commissioner service on the Khabarovsk Bypass
25.09.2024
The new free service was introduced at the initiative of the holding.
Traffic launched on the six-lane exit of the left-bank interchange of the bridge being built in Novosibirsk
20.09.2024
VIS Group has completed the construction of the new exit 4 at Energetikov Square.
VIS Group relocates a plant that manufactures reinforcement cages for the Lena Bridge supports to Yakutsk
18.09.2024
Large-scale work is underway on both banks of the Lena River to fill technological sites, supply, assemble and install special equipment and industrial plants.
The final painting of the facade of the new Yamal government building is 60% complete
17.09.2024
The total area of being painted is 16,000 m2, of which 10,000 m2 have already been painted.
Spruce and birch trees planted near the Doverie center in Salekhard
13.09.2024
A total of 48 young trees appeared as part of the event.
Laying of cast asphalt has begun on the Mytishchi high-speed chord overpasses
11.09.2024
The work is being carried out simultaneously on several overpasses; 5,509.5 m2 of cast asphalt have already been laid.
Glazing of the Arctic Center facade in Yakutsk is more than half complete
06.09.2024
The overall construction readiness of the new cultural cluster in Yakutsk currently exceeds 60%.
Traffic launched on the Mytishchi Chord under construction through the tunnel at the intersection with the Old Yaroslavskoe Highway
05.09.2024
VIS Group has completed construction of the first line of the 43-meter tunnel, which is part of the sixth interchange.