VIS Group presents its experience in the implementation of transport concessions at the International Congress in Ufa
21.09.2022
To date, these projects account for 76% of its total contract portfolio.
VIS Group’s PPP project will radically change the healthcare system in Novosibirsk
15.09.2022
The Governor of the Novosibirsk Region Andrey Travnikov visited the construction sites of polyclinics in the Kirovsky and Oktyabrsky districts of the city.
Over 700,000 vehicles have passed through Khabarovsk Bypass since mid-July
14.09.2022
On average, about 14,000 cars drive along the highway daily.
VIS Group’s projects are of strategic importance for the development of the Russian Far East
07.09.2022
Project to create the first high-speed highway in the Russian Far East in the Khabarovsk Territory was noted as an example of successful collaboration between the state and business.
Overpass span installation begins over the Pirogovskoye highway of the Mytishchi high-speed chord under construction
31.08.2022
It spans 240 meters, with the total weight of the superstructure amounting to 997 tons.
Large-scale work underway in the left-bank part of Novosibirsk to build a transport interchange that has no analogues in Russia
19.08.2022
The current construction readiness of the bridge across the Ob River and the adjacent infrastructure exceeds 55%.
120 people are engaged in the construction of the State Philharmonic and the Arctic Center for Epic Literature and the Arts in Yakutsk
18.08.2022
Installers, technicians, crane operators, geodetic engineers, carpenters, fitters, concrete workers and laborers work onsite in two shifts, employing four tower cranes and special equipment.
Expert RA affirmed VIS Group’s credit rating at ruA with a stable outlook
15.08.2022
Analysts of Expert RA noted a high level of corporate governance, strategy development and a sufficient level of risk management regulation.