Head of Yakutia takes part in the SMART polyclinic construction launch ceremony in Yakutsk
02.07.2022
One of the largest medical complexes with an area of 8.9 thousand square meters will appear in the Republic thanks to VIS Group's PPP project.
Aide to the President of the Russian Federation Igor Levitin proposed to consider an extension of the highway being constructed as part of a bridge concession project in Novosibirsk
23.06.2022
This will significantly improve traffic in one of the currently busiest areas of the Novosibirsk urban agglomeration.
The bridge over the Ob River in Novosibirsk will be almost 80% completed by the end of 2022
23.06.2022
The largest road concession in Siberia is being implemented in accordance with the schedule
Siberian Transport Forum: VIS Group presents the Novosibirsk high-speed chord under construction
22.06.2022
he largest road concession in Siberia includes the construction of both the bridge itself and an entire complex of road approaches, tunnels and multi-level interchanges.
Surgut perinatal center project wins ROSINFRA National Award
16.06.2022
This is VIS Group’s second public-private partnership project recognized as the best in the healthcare field, and the holding’s eighth winning nomination at the ROSINFRA National Award over the years of its existence.
Roadbed of the high-speed highway in the Moscow region will comply with modern world standards
03.06.2022
To date, about 2 million m3 of soil have been laid in the road structure, amounting to 45% of the total volume.
Work is resumed at the cultural cluster construction site in Yakutia after the winter technological break
24.05.2022
The project provides for the construction of an integrated building of the State Philharmonic Society and the Arctic Center for Epic Literature and the Arts with a total area of almost 33,000 m2 and a height of 36.7 m.
Pre-assembly of metal structures of the Zyryanovsky overpass in Novosibirsk is completed
23.05.2022
The facility’s current overall construction readiness is 60%.