120 people are engaged in the construction of the State Philharmonic and the Arctic Center for Epic Literature and the Arts in Yakutsk
18.08.2022
Installers, technicians, crane operators, geodetic engineers, carpenters, fitters, concrete workers and laborers work onsite in two shifts, employing four tower cranes and special equipment.
Expert RA affirmed VIS Group’s credit rating at ruA with a stable outlook
15.08.2022
Analysts of Expert RA noted a high level of corporate governance, strategy development and a sufficient level of risk management regulation.
ACRA confirmed VIS Group’s credit rating at A(RU)
10.08.2022
The press release confirming the rating notes the strong business profile, stable market position, high level of profitability and good regional diversification of VIS Group's operations.
Work on the PPP project in Novosibirsk is being carried out at seven clinics sites
02.08.2022
As a result of the implementation of the PPP project, over 320,000 residents of the Oktyabrsky, Kirovsky, Leninsky and Zaeltsovsky districts will receive access to new medical infrastructure.
The superstructure of the bridge across the Ob in Novosibirsk is being installed in the design position
26.07.2022
The work on its sliding was completed at the end of March 2022, now the builders will have to carry out an equally complex technological operation.
Head of Yakutia visits the construction site of the State Philharmonic and the Arctic Center for Epic Literature and the Arts in Yakutsk
24.07.2022
To date, the facility’s overall construction readiness is estimated at 25%, the monolithic frame of the building is 55% ready.
Over 86,000 cars have passed through the Khabarovsk Bypass in the first week since the launch of traffic
22.07.2022
Between 00:00 on July 16 and 20:00 (Khabarovsk time) on July 22, traffic monitor devices recorded 86,249 vehicles that used the road.
First-stage work on the bridge concession in Yakutia is deployed on both banks of the Lena River
19.07.2022
VIS Group continues the implementation of the first (preparatory) stage of the concession project to build a bridge across the Lena River in the Republic of Sakha (Yakutia).