Over the weekend, a span of the pedestrian crossing was installed over the Energetikov road as part of the bridge concession in Novosibirsk
14.08.2023
It was possible to carry out the work without blocking road traffic.
VIS Group congratulates its colleagues and partners on Builder
13.08.2023
Thanks to the people who have chosen this profession, the most complex projects come to life.
Expert RA raises VIS Group’s credit rating to ruA+ level
10.08.2023
The rating forecast is stable.
The governor of Novosibirsk region visits the construction site of the PPP polyclinic being built by VIS Group
10.08.2023
Today, the facility is in a high degree of readiness. The work on the facade is 98% completed, the interior decoration is 83% completed.
New water treatment complex in Solnechnogorsk more than 20% complete
04.08.2023
The construction project of VIS Group is part of the Ecology National Project and the Volga Revitalization Federal Project.
VIS Group presents construction progress of one of the largest cultural clusters in the Russian Far East to head of Yakutia
29.07.2023
On July 29 Aisen Nikolaev visited the construction site of the State Philharmonic and the Arctic Center in Yakutsk.
The Governor of the Moscow region drove along a section of the Mytishchi high-speed chord under construction
27.07.2023
The head of the region drove a car along one of the sections of the road in a high degree of readiness around Pirogovskoye highway.
A modern water treatment system is being created at the Mytishchi high-speed chord under construction
24.07.2023
The project provides for thirteen local wastewater treatment plants with a total volume of about 15,000 m3 are provided.