Interior design concept for a future cultural cluster in the Far East approved
29.08.2023
The adopted interior design concept reflects the desire to create a harmonious space that will visually and symbolically unite music, culture and nature of Yakutia.
VIS Group completed installation of cable-stayed bridge system in Novosibirsk
25.08.2023
All 35 pairs - 70 cables have been installed.
The penultimate pair of cables has been installed on the bridge over the Ob River in Novosibirsk
22.08.2023
A total of 68 out of 70 cables have been installed.
Doverie social center in Salekhard will be ready for commissioning this autumn
17.08.2023
The readiness of the object is more than 90%.
Over the weekend, a span of the pedestrian crossing was installed over the Energetikov road as part of the bridge concession in Novosibirsk
14.08.2023
It was possible to carry out the work without blocking road traffic.
VIS Group congratulates its colleagues and partners on Builder
13.08.2023
Thanks to the people who have chosen this profession, the most complex projects come to life.
Expert RA raises VIS Group’s credit rating to ruA+ level
10.08.2023
The rating forecast is stable.
The governor of Novosibirsk region visits the construction site of the PPP polyclinic being built by VIS Group
10.08.2023
Today, the facility is in a high degree of readiness. The work on the facade is 98% completed, the interior decoration is 83% completed.