Top asphalt layer is being placed on the Mytishchi Expressway under construction
15.09.2023
Currently, this work has been completed on a 3.5-kilometer section of the road.
An agreement is signed between VIS Group and the Trans-Baikal Territory at the Eastern Economic Forum
12.09.2023
The document was signed by the Governor of the Trans-Baikal Territory Alexander Osipov and Deputy CEO of VIS Group Artyom Melikhov.
VIS Group received a positive conclusion from the Glavgosexpertiza on the project documentation for the Lena Bridge
09.09.2023
VIS Group has begun preparing the paperwork to obtain a construction permit.
VIS Group has increased the pace of construction of the Arctic Center in Yakutsk
06.09.2023
The pace of construction has been increased, work at the site is now conducted around-the-clock, with over 200 people and 14 units of special equipment.
Commissioning readiness of the PPP clinic No. 7 in Novosibirsk assessed by City Council deputies
04.09.2023
VIS Group completed construction work and landscaping at Polyclinic #7 on Proletarsky street, commissioning of all engineering systems was carried out in full.
VIS Group opens up one of the largest embankments in the Far North to the public
02.09.2023
This was a symbolic gift for the 90th anniversary of the town of Tarko-Sale in Yamal.
Net profit of VIS Group increased 4.5 times in the first half of 2023
30.08.2023
Almost all items recorded a significant increase in financial indicators compared to the same period last year.
Interior design concept for a future cultural cluster in the Far East approved
29.08.2023
The adopted interior design concept reflects the desire to create a harmonious space that will visually and symbolically unite music, culture and nature of Yakutia.