VIS Group prepares two PPP polyclinics for commissioning in Novosibirsk
03.07.2023
The degree of readiness of two of the seven polyclinics being built by VIS Group in Novosibirsk was assessed by journalists.
VIS Group completes the placement of bonds for 2 billion rubles
30.06.2023
The Expert RA rating agency assigned the securities an expected credit rating of ruА(EXP).
VIS Group announces 85% construction readiness of the fourth bridge across the Ob at the Siberian Transport Forum
30.06.2023
The implementation of the bridge concession has become one of the central topics of interest to journalists at the forum.
VIS Group and the Khabarovsk Territory signed an agreement on the introduction of interoperability on the Khabarovsk Bypass highway
28.06.2023
The parties agreed that the concessionaire will join the Interoperator Cooperation Agreement.
The bridge under construction across the Ob became the largest installation at the Siberian Transport Forum exhibition
28.06.2023
One of the exhibition’s brightest points of attraction for visitors was VIS Group's VR station.
45% of the first layer of asphalt concrete on the Mytishchi high-speed chord under construction has been laid
22.06.2023
To date, the first, 16-cm layer of asphalt concrete has been laid over 7.5 km.
26 cables were mounted by the builders of the bridge across the Ob in Novosibirsk
20.06.2023
Installation of a cable-stayed system with 70 cables is a complex technological process that began in early May with the pairwise tensioning of the shortest cables.
VIS Group submits the revised part of the Lensky Bridge project in Yakutia for consideration by Glavgosexpertiza
08.06.2023
The documentation has already passed entrance control.