VIS Group has increased the pace of construction of the Arctic Center in Yakutsk
06.09.2023
The pace of construction has been increased, work at the site is now conducted around-the-clock, with over 200 people and 14 units of special equipment.
Commissioning readiness of the PPP clinic No. 7 in Novosibirsk assessed by City Council deputies
04.09.2023
VIS Group completed construction work and landscaping at Polyclinic #7 on Proletarsky street, commissioning of all engineering systems was carried out in full.
VIS Group opens up one of the largest embankments in the Far North to the public
02.09.2023
This was a symbolic gift for the 90th anniversary of the town of Tarko-Sale in Yamal.
Net profit of VIS Group increased 4.5 times in the first half of 2023
30.08.2023
Almost all items recorded a significant increase in financial indicators compared to the same period last year.
Interior design concept for a future cultural cluster in the Far East approved
29.08.2023
The adopted interior design concept reflects the desire to create a harmonious space that will visually and symbolically unite music, culture and nature of Yakutia.
VIS Group completed installation of cable-stayed bridge system in Novosibirsk
25.08.2023
All 35 pairs - 70 cables have been installed.
The penultimate pair of cables has been installed on the bridge over the Ob River in Novosibirsk
22.08.2023
A total of 68 out of 70 cables have been installed.
Doverie social center in Salekhard will be ready for commissioning this autumn
17.08.2023
The readiness of the object is more than 90%.