Deputy Minister of Culture of the Russian Federation Vladimir Osintsev praised the progress in construction of the cultural cluster being built by VIS Group in Yakutsk
21.10.2023
Today it is one of the largest social infrastructure facilities being built in Yakutia.
Large-scale exercises of the Ministry of Emergency Situations took place on the Khabarovsk Bypass highway with the involvement of air ambulances
19.10.2023
For the second year in a row, the Khabarovsk Bypass highway, built and operated by VIS Group, has become a platform for conducting exercises aimed at the elimination of the consequences of traffic accidents.
The road surface of the main course of the Mytishchi Expressway is 40% ready
18.10.2023
Work on laying the top layer of asphalt concrete has been completed on 6 km of the highway under construction in the Moscow region.
Preparations are being made for the installation of facade structures with a total area of over 7,000 m2 at the construction site of a cultural cluster in Yakutsk
14.10.2023
Curvilinear stained-glass windows will be installed along the perimeter of the building.
The 5 out of 7 clinic buildings of the PPP project in Novosibirsk have been fully constructed
10.10.2023
Three of them are in a high degree of readiness, façade work has begun in two more medical complexes and the thermal circuit of the buildings is closed.
The reconstruction of utility networks has been completed by 20% on the reconstructed section of Afanasovskoye Highway
04.10.2023
The reconstruction is being carried out to increase the capacity of the section adjacent to the Mytishchi Expressway under construction.
The Doverie rehabilitation center in Salekhard will be outfitted with equipment unique to Yamal. The Governor of Yamal assessed the degree of readiness of the facility, the construction of which is being completed by VIS Group
28.09.2023
Today the overall readiness of the three-story building is estimated at 93%.
VIS Group continues the construction of a water treatment complex as part of the National Project “Ecology” in Solnechnogorsk
26.09.2023
The degree of readiness of the utility infrastructure facility is about 30%.