19.09.2023
Cast asphalt is being laid on the cable-stayed section of a bridge under construction in Novosibirsk
The installation of road pavement on the spans of the 380-meter cable-stayed bridge began after the completion of cable installation.
|
|
15.09.2023
Currently, this work has been completed on a 3.5-kilometer section of the road.
|
|
12.09.2023
The document was signed by the Governor of the Trans-Baikal Territory Alexander Osipov and Deputy CEO of VIS Group Artyom Melikhov.
|
|
09.09.2023
VIS Group has begun preparing the paperwork to obtain a construction permit.
|
|
06.09.2023
The pace of construction has been increased, work at the site is now conducted around-the-clock, with over 200 people and 14 units of special equipment.
|
|
04.09.2023
VIS Group completed construction work and landscaping at Polyclinic #7 on Proletarsky street, commissioning of all engineering systems was carried out in full.
|
|
02.09.2023
This was a symbolic gift for the 90th anniversary of the town of Tarko-Sale in Yamal.
|
|
30.08.2023
Almost all items recorded a significant increase in financial indicators compared to the same period last year.
|
|